What does a two-bedroom apartment in Mina Al Arab cost?
In the catalogue, a two-bedroom apartment in Mina Al Arab starts at 2,257,000 AED. Half of the projects in this selection start below 2,523,000 AED, and the smallest of these apartments measures 101 m². All 7 projects in the selection are under construction, and none is completed.
| Project | Developer | Price from |
|---|---|---|
| Solera Downtown Mina | RAK | AED 2,257,000 |
| Mirasol | RAK | AED 2,344,000 |
| SKAI | RAK | AED 2,414,000 |
| Nura | RAK | AED 2,523,000 |
| Mirasol 2 | RAK | AED 2,581,000 |
| Anantara Apartments | RAK | AED 6,065,000 |
| Quattro Del Mar | RAK | AED 6,692,000 |
Catalogue data as of 04.11.2026
Starting prices across the seven projects
The lowest and highest starting prices in the catalogue sit far apart. The entries below show where each project begins:
- Solera Downtown Mina starts at 2,257,000 AED.
- Mirasol starts at 2,344,000 AED.
- SKAI starts at 2,414,000 AED.
- Nura starts at 2,523,000 AED, the median figure.
- Mirasol 2 starts at 2,581,000 AED.
- Anantara Apartments starts at 6,065,000 AED.
- Quattro Del Mar starts at 6,692,000 AED.
The two highest starts stand well above the rest. A buyer comparing the entry point alone sees a spread from 2,257,000 AED to 6,692,000 AED within the same selection.
One developer behind every project
RAK is named as the developer of all 7 projects in the catalogue. The selection therefore shows no difference between developers, and any comparison comes down to the projects themselves and their handover dates.
Handover years of the projects under construction
Every project in the selection is under construction, and the handover years divide them into three groups:
- One project hands over in 2027: Quattro Del Mar.
- Five projects hand over in 2028: Solera Downtown Mina and SKAI in Q2, Mirasol in Q1, Mirasol 2 and Anantara Apartments in Q3.
- One project hands over in 2029: Nura.
The largest group by handover year is 2028, which holds five of the seven projects. The 2027 and 2029 years hold one project each.
Price and handover together
The earliest handover in the catalogue, Quattro Del Mar in 2027, carries the highest starting price at 6,692,000 AED. The latest, Nura in 2029, starts at the median figure of 2,523,000 AED. The cheapest start, Solera Downtown Mina at 2,257,000 AED, hands over in Q2 2028, in the same year as four other projects. Reading the two figures side by side shows that an earlier handover does not sit at the lower end of the starting prices in this selection.
Frequently asked questions
What is the lowest starting price for a two-bedroom apartment in Mina Al Arab in the catalogue?
The lowest starting price is 2,257,000 AED, recorded for Solera Downtown Mina.
How many two-bedroom projects in Mina Al Arab are completed in the catalogue?
None of the 7 projects is completed, and all 7 are under construction.
Which handover year covers most of the two-bedroom projects in Mina Al Arab?
2028 covers five of the seven projects, more than 2027 and 2029 together.
Projects
Under constructionSolera Downtown Mina
Under constructionMirasol
Under constructionSKAI
Under constructionNura
Under constructionMirasol 2
Under constructionAnantara Apartments
Under constructionQuattro Del Mar
Articles
How much does a one-bedroom apartment cost in Mina Al Arab?
What does a three-bedroom apartment in Mina Al Arab cost?
What villas and townhouses are there in Mina Al Arab?
What does a two-bedroom apartment in Dubai cost in this catalogue?
What does a two-bedroom apartment cost in the UAE in this catalogue?
What does a two-bedroom apartment cost in Abu Dhabi?
Get a selection of projects
Leave your number and choose a messenger. We will reply there.