EN
РусскийEnglish中文العربيةFrançaisEspañolDeutsch
Get a selection
Menu
EmiratesAll projectsDevelopersArticles

Celesto 2 Tower

Wadi Al Safa 5, Dubai · Tarrad Development

Price from AED 550,000

Project facts

Emirate
Dubai
Status
Under construction
Handover
Q3 2028
Price per m²
AED 15,447
Units
231
Floors
13
Project area
11,039 m²
Project type
Residential building
Ownership
Freehold
Escrow account
First Abu Dhabi Bank P.J.S.C.
Service charge
151 AED per m² per year

Floor plans and prices

TypeAvailableAreaPrice
Studios129–30 m² (313+ sq ft)AED 550,000 – AED 580,000
1 bedroom651–63 m² (550+ sq ft)AED 800,000 – AED 1,059,166
2 bedrooms86 m² (930+ sq ft)AED 1,380,000

Developer payment plan

  • 20%on booking
  • 30%during construction
  • 50%on handover

On top of the price: DLD fee 4%

About the project

Celesto 2 Tower is a thirteen-storey residential tower under construction in Wadi Al Safa 5, Dubai, developed by Tarrad Development. The building is planned for handover in Q3 2028. Apartments start from 550,000 AED, and ownership is freehold.

Apartments and layouts

The tower holds 231 apartments: 104 studios, 102 one-bedroom units and 25 two-bedroom units. Every apartment has a balcony, and floor areas are given including the balcony. Studios range from 29.06 m² to 29.73 m² and start from 550,000 AED. One-bedroom apartments run from 51.1 m² to 63.32 m² and start from 800,000 AED. Two-bedroom apartments start from 86.4 m² and from 1,380,000 AED.

Furnishing and smart home systems

Apartments will be sold fully furnished. Kitchens will come with built-in appliances, and each apartment will have an Alexa-based smart home system. Living rooms will be combined with dining areas.

Building layout

The first floor will hold the entrance, shops, services and some parking spaces. Three parking floors will sit on the podium above it. The first residential floor will contain 15 apartments, a pool, rest areas, a gym and a health club; twelve typical floors above it will each hold 18 apartments. The building will provide 234 parking spaces.

Amenities

The first residential floor will include a pool, a jacuzzi and a fountain. The building will also have a barbecue area and seating areas, an outdoor gym, a yoga space, an indoor gym and a health club split into women's and men's sections. A children's playground and a separate play area will be part of the project. CARD also lists a rooftop terrace, a games room and a spa.

Payment plan and handover

The payment plan is 20% on booking, 30% during construction in thirty instalments, and 50% on handover. A 4% DLD fee is payable separately at booking, along with an administrative fee. The service charge is 150.69 AED per m² per year. The project escrow account is held at First Abu Dhabi Bank. Handover is planned for Q3 2028.

Location

The tower will stand on a 2 496,87 m² plot in Dubai Land Residence Complex. The site borders the Sheikh Zayed Bin Hamdan Al Nahyan road. Wadi Al Safa 5 lies on one side of the complex and Al Rowaiyah Second on the other. Dubai-Al Ain Road and Emirates Road run along the complex.

Amenities

  • Pool
  • Rooftop Terrace
  • Games room
  • Gym
  • Clubhouse
  • Barbecue area
  • Kids' play area
  • Sauna
  • Spa

Location

Wadi Al Safa 5, Dubai. Open on the map

Questions and answers

How much does a home in Celesto 2 Tower cost?

Prices start from AED 550,000.

When is the handover of Celesto 2 Tower?

The planned handover date is Q3 2028.

Who is the developer of Celesto 2 Tower?

The project is developed by Tarrad Development.

What is the payment plan for Celesto 2 Tower?

20% on booking · 30% during construction · 50% on handover.

Where is Celesto 2 Tower located?

Wadi Al Safa 5, Dubai.

Similar projects

Get a selection