ELAR1S Axis
Jumeirah Village Triangle (JVT), Dubai · Object One
Price from AED 1,141,956
Project facts
- Developer
- Object One
- District
- Jumeirah Village Triangle (JVT)
- Emirate
- Dubai
- Status
- Under construction
- Handover
- Q3 2028
- Construction progress
- 2%
- Price per m²
- AED 19,375
- Units
- 256
- Floors
- 18
- Project area
- 19,892 m²
- Project type
- Residential building
- Ownership
- Freehold
- Escrow account
- Abu Dhabi Islamic Bank
- Service charge
- 161 AED per m² per year
Floor plans and prices
| Type | Available | Area | Price |
|---|---|---|---|
| Studios | 4 | 48–89 m² (521+ sq ft) | Price on request |
| 1 bedroom | 30 | 59–148 m² (634+ sq ft) | AED 1,141,956 – AED 2,267,641 |
| Commercial units | 9 | 89–248 m² (960+ sq ft) | AED 2,016,756 – AED 5,881,304 |
Developer payment plan
- 20%on booking
- 50%during construction
- 30%on handover
- 20%on booking
- 50%during construction
- 5%on handover
- 25%after handover
On top of the price: DLD fee 4%
About the project
ELAR1S Axis is a new-build project by Object One in Jumeirah Village Triangle (JVT), Dubai. The tower is under construction and handover is scheduled for Q3 2028. It combines homes, offices and retail, and the homes are freehold.
The building and its levels
The building is arranged as B+G+5P+18+R: a basement floor, a ground level, five podium levels, 18 main floors and a usable roof. The residential part sits on floors 12 to 18 and holds 70 residences. Offices occupy the first main floor and floors two to eleven, shops take the ground floor and podium P1, and the basement is parking for retail and offices, with further parking on podiums two to five. Construction progress stands at 2%.
Homes and prices
The project has 256 units in total, including 54 one-bedroom apartments. Studios range from 48.44 m² to 88.59 m². One-bedroom apartments range from 58.92 m² to 148.36 m² and start at 1,141,956 AED. Commercial units range from 89.22 m² to 248.36 m² and start at 2,016,756 AED. The price per m² is 19,375 AED, and the service charge is 161.46 AED per m² a year.
Payment plan
The payment plan for apartments is 20% on booking, 50% during construction, 5% on handover and 25% after handover. A separate project account is held at Abu Dhabi Islamic Bank.
Access and home automation
The entrance door can be opened with a smartphone or a smart watch. Virtual keys have three access levels, and permits for keyless entry can be set for family members, friends and service staff. Home automation will control light brightness, music and temperature, and security at home has its own controls. By design, the developer may replace materials with equivalent ones, and only the contract has force.
Amenities and the area
A swimming pool and a children's pool are planned for the first main floor, along with a sun lounger area, a clubhouse, a barbecue area, a gym, an outdoor lounge and separate prayer rooms for men and women. An outdoor running track and crossfit area will sit on the same level, and a roof terrace is planned at the top. The Office Terrace is on the first main floor. The district is gated and patrolled, and schools are within walking distance, including Arcadia and Sunmarke. The district lies at the intersection of Sheikh Mohammed Bin Zayed Road (E311) and Al Khail Road (E44), and the drive to Dubai Marina, Downtown and the airports takes 15-20 minutes.
Amenities
- Barbecue area
- Rooftop Terrace
- Pool
- Clubhouse
- Gym
- Kids' play area
Location
Jumeirah Village Triangle (JVT), Dubai. Open on the map
Questions and answers
How much does a home in ELAR1S Axis cost?
Prices start from AED 1,141,956.
When is the handover of ELAR1S Axis?
The planned handover date is Q3 2028.
Who is the developer of ELAR1S Axis?
The project is developed by Object One.
What is the payment plan for ELAR1S Axis?
20% on booking · 50% during construction · 30% on handover · 20% on booking · 50% during construction · 5% on handover · 25% after handover.
Where is ELAR1S Axis located?
Jumeirah Village Triangle (JVT), Dubai.
Similar projects
Under constructionLUM1NAR
Under constructionVoxa
Under constructionElar1s Rise
Under construction